Plan revision comparison: what changed in the BOQ?

Plans change throughout a project: a wall moves, an opening is added, a material changes or a detail receives new dimensions. A plan revision comparison should explain not only that the documents differ, but how the change affects quantities and the cost estimate.

Example / illustration: every line has a source
Item and source Quantity
WallSheet A-101, layer A-WALL 324.5 m²
DoorsSheet A-101, layer A-DOOR 18 pcs
ConcreteSheet S-201, layer S-CONC 42.3 m³

Start with a clear comparison baseline

To understand a change, the team needs to know which version is the previous one and which is the new one. The approved BOQ can then serve as the reference point, so the next revision is checked against a known baseline instead of mixing files from different stages.

  • Added lines point to new work introduced by the plans.
  • Removed lines show work that is no longer required in the revision.
  • A quantity change should lead back to the element or area that changed.
  • The cost difference should stay connected to the lines that created it, not appear only as one total.

The total is only the start of the review

An increase or decrease in the total does not explain what happened by itself. A useful explanation breaks the difference down into changed quantities and lines, so the team can see what comes from the plans and what still depends on a rate, an assumption or missing information.

Return to the source of the line

When a quantity changes, the source of the line — the sheet, layer and entity — gives the reviewer a clear place to start. The confidence tier helps focus attention on lines that need it, but it does not replace a professional review of the plans and the meaning of the change.

What should be checked before approving a revision?

Check that the correct versions were compared, that added and removed lines match the design, that the units still fit and that every unusual change has an explanation. If a document or detail is missing, keep the gap visible instead of presenting certainty without a basis.

A reference point for the next revision

BOQIFY supports revisions and explains the cost difference from one version to the next. The BOQ goes to you for approval, you can edit any line and check its source, and the approved version is frozen with a digital fingerprint. Talk to us and we will show you the comparison on your plans.

See what changed between versions

Talk to us and we will show you how BOQIFY connects plan changes to BOQ lines and the cost difference.