The BOQIFY blog
Practical guides on quantity takeoff and the bill of quantities, from our work in construction tech (ConTech).

| Item and source | Quantity |
|---|---|
| WallSheet A-101, layer A-WALL | 324.5 m² |
| DoorsSheet A-101, layer A-DOOR | 18 pcs |
| ConcreteSheet S-201, layer S-CONC | 42.3 m³ |
Latest guides
-
Quantity takeoff workflow: from plans to an approved BOQ
A quantity takeoff workflow fixes the plan revision, keeps a source for every line and ends with an approved BOQ for the next revision.
-
Paid quantity takeoff pilot: how to test value on one project
A paid quantity takeoff pilot defines the deliverable, measures and limitations on one real project, supporting an evidence-based decision about scaling.
-
Plan revision comparison: what changed in the BOQ?
A plan revision comparison shows what changed in the BOQ, what affected the cost difference and which lines still need review before approval.
-
A source for every BOQ line: how to review the numbers
A source for every BOQ line shows where a quantity came from, helps you focus the review and keeps the approved result connected to information you can revisit.
-
Construction cost estimate range: why one number is not enough
A construction cost estimate can show a range, sources and assumptions instead of one number that hides uncertainty. See what makes an estimate stronger.
-
BOQIFY in AEC Magazine: rethinking construction quantity takeoff
BOQIFY appears in AEC Magazine. See how measurement, semantic interpretation and transparency come together in a better BOQ workflow.
-
BOQ checks before you send it: the questions that save arguments
Short checks for a bill of quantities before it goes out: totals, lines left out of the sum, missing items, lump sums and duplicate lines.
-
Plan file formats for quantity takeoff: what works today
Which plan files work for quantity takeoff: DWG, DXF, vector PDF and Revit.
-
From plans to a bill of quantities: what BOQIFY does for you
See what BOQIFY does for you: it measures and counts from the plans, prepares the BOQ, supports revisions and checks an existing BOQ.
-
BOQ unit errors: the mistake that inflates a line
A wrong unit can inflate a BOQ line. A real, anonymised case of a floor measured in linear metres, and how to catch it.
